• Kenya says its electrical energy grid can not maintain the proposed one-gigawatt Microsoft facility demand
  • President Ruto warns powering the undertaking would require nationwide electrical energy rationing measures
  • The preliminary 100-megawatt part already strains Olkaria geothermal output capability

A proposed Microsoft 1-gigawatt knowledge heart in Kenya would demand a lot electrical energy that the nation merely can not provide that energy.

Microsoft and Abu Dhabi-based G42 introduced the undertaking in Could 2024 throughout President Ruto’s official go to to Washington DC, promising a geothermal-powered cloud area within the Olkaria space of Kenya’s Rift Valley area.


Source link