The UK’s state-owned financial savings financial institution has blown previous its funds by £1.3 billion on a digital transformation program beset by delays, in keeping with the Nationwide Audit Workplace.

Nationwide Financial savings & Investments (NS&I), which brings in authorities funding via the retail financial savings market, has pushed the challenge again by 4 years after working into procurement snags and technical complexity, the general public spending watchdog’s report mentioned.

In 2020, NS&I started a enterprise transformation program referred to as Mission Rainbow which aimed to scale back the financial institution’s working prices, make NS&I a self-service digital enterprise, and substitute its 20-year outsourcing take care of Atos by splitting the work into 5 separate contracts.

In 2014, the financial institution, which handles £240 billion in buyer investments, awarded Atos a brand new contract to run till 2021, after which prolonged it till 2024 and once more till 2028 without competition, handing the French outsourcer one other £474.4 million.

The entire value of this system is predicted to hit £3.0 billion till 2030-31, together with its contract with Atos and different working prices. The entire value enhance is ready for £1.3 billion in comparison with the 2020 enterprise case.

“NS&I set itself an excessively optimistic timetable for this system,” the NAO report mentioned. “Decoupling a extremely built-in operation, splitting it into smaller components after which integrating these techniques collectively is extremely advanced. NS&I had restricted expertise of delivering a program of this scale and complexity, however it set an formidable scope and timetable. The timetable didn’t think about contingency for delays, enable time for understanding the technical infrastructure and testing options, or outline how it could resolve interdependencies and handle techniques integration.”

In addition to underestimating the technical complexity, NS&I additionally lacked the business abilities to handle such an formidable tech procurement plan, the watchdog mentioned.

“NS&I encountered important issues in procuring and awarding the brand new contracts,” the NAO discovered. “NS&I awarded two contracts as meant; one procurement was initially unsuccessful however subsequently re-run and a contract awarded; one procurement resulted in an award, however NS&I subsequently terminated the contract; and one procurement was deserted as a result of NS&I and the popular bidder couldn’t agree phrases.”

“NS&I had a weak understanding of the complexity and interdependencies of the extremely built-in system it was in search of to interchange, resulting in the issues in supply and delayed timescales,” the report mentioned. “It lacked a techniques integrator operate to enhance this understanding.”

It additionally discovered NS&I didn’t have an built-in plan or end-to-end resolution, making it tough to trace efficiency, spending, and threat.

“NS&I had no prior expertise of enterprise such applications, and for a lot of this system it has had inadequate digital, business and program administration experience,” the report mentioned.

The financial institution started a program reset in July 2024 and commissioned a “Restoration Plan” from PA Consulting. Program resets can contain a basic change to a program’s output, timing, and strategy, or a major revision of value and time estimates.

Different suppliers concerned in this system embrace Capgemini, EY, PA Consulting, Actica, IBM, and Sopra Steria. ®